Airport Earth Work
This active North Carolina project required a team that could work safely around a critical transportation facility. But that's not all!
Project Gallery

Bentonite Hydraulic Cut-Off Wall Installation
Charlotte, NC
Summit constructed a bentonite-based hydraulic cut-off wall within an active airport environment adjacent to a runway and taxiway.
Read the Full Story >>
Emergency Storm Sewer Repair
Brick, NJ
Summit delivered a complete investigation-to-restoration solution for an urgent subsurface infrastructure issue involving a monitoring well that punctured a storm sewer line.
Read the Full Story >>
Sonic Drilling – Overburden & Bedrock Wells
Charlestown, RI
Large-scale sonic drilling and well installation program at a U.S. Army Corps of Engineers site with 30 overburden wells and rock coring to 150 feet.
Read the Full Story >>
Methane Mitigation System with Cupolex & VIMS
Charlotte, NC
Installation of a complex methane mitigation system for a 7-story building including 15,920 sq. ft. of Cupolex domed forming system.
Read the Full Story >>
Permeable Reactive Barrier (PRB) Installation
Gastonia, NC
Rapid installation of a permeable reactive barrier at a Southeastern superfund site in response to an urgent groundwater issue.
Read the Full Story >>
GPR & Drilling – Subsurface Investigation
Linden, NJ
Multi-technology subsurface investigation including GPR preclearance, drilling across 16 locations, and installation of injection wells.
Read the Full Story >>
Long-Term Injection & Monitoring Well Program
Princeton Junction, NJ
Nine years of continuous involvement supporting environmental investigation and remediation efforts with multiple drilling technologies.
Read the Full Story >>
Sonic Drilling on Collegiate Athletic Field
Princeton, NJ
High-resolution subsurface investigation on Princeton University's baseball field using Terra Sonic technology with zero impact to artificial turf.
Read the Full Story >>
Multi-Depth Monitoring Well Installation
Raleigh, NC
Installation of 10 monitoring wells to depths up to 170 feet, completed 7 days ahead of schedule with multi-crew coordination.
Read the Full Story >>
Shallow Bedrock Well Installation
Roselle, NJ
Precision drilling in a space-restricted urban environment with installation of three shallow bedrock monitoring wells.
Read the Full Story >>
Engineering Cap Repair & Streambank Stabilization
Spartanburg, SC
Restoration of 200 linear feet of storm-damaged streambank and multi-layer engineered cap system in dense woodland.
Read the Full Story >>
Deep Vertical Aquifer Profile (VAP) Investigation
Spartanburg, SC
Deep roto-sonic drilling to 300 feet with high-resolution vertical profiling of VOCs in groundwater at 6 VAP locations.
Read the Full Story >>
Sonic Drilling Advances Titanium Exploration Across Two States
Virginia & North Carolina
Summit completed approximately 200 sonic soil borings to depths of 30 to 60 feet across rural properties in two states to support a large-scale titanium mineral exploration program.
Read the Full Story >>
Sonic Drilling Supports Phosphate Mining Development in Florida
Fort Meade, FL
Two track-mounted sonic rigs completed 30 lithologic borings to depths of up to 150 feet, installed four piezometers, and conducted pump testing to inform future phosphate mining and dewatering plans.
Read the Full Story >>
Advancing Sand Mining Operations with Reliable Groundwater Data
Perry, FL
In five days, one sonic rig and crew installed 13 protected piezometers to give a sand mining operator the groundwater data needed for dewatering planning.