Airport Earth Work Project
Summit Mountain
RibbonFEATURED PROJECT

Airport Earth Work

This active North Carolina project required a team that could work safely around a critical transportation facility. But that's not all!

Project Gallery

Bentonite Hydraulic Cut-Off Wall Installation

Bentonite Hydraulic Cut-Off Wall Installation

Charlotte, NC

Summit constructed a bentonite-based hydraulic cut-off wall within an active airport environment adjacent to a runway and taxiway.

Read the Full Story >>
Emergency Storm Sewer Repair

Emergency Storm Sewer Repair

Brick, NJ

Summit delivered a complete investigation-to-restoration solution for an urgent subsurface infrastructure issue involving a monitoring well that punctured a storm sewer line.

Read the Full Story >>
Sonic Drilling – Overburden & Bedrock Wells

Sonic Drilling – Overburden & Bedrock Wells

Charlestown, RI

Large-scale sonic drilling and well installation program at a U.S. Army Corps of Engineers site with 30 overburden wells and rock coring to 150 feet.

Read the Full Story >>
Methane Mitigation System with Cupolex & VIMS

Methane Mitigation System with Cupolex & VIMS

Charlotte, NC

Installation of a complex methane mitigation system for a 7-story building including 15,920 sq. ft. of Cupolex domed forming system.

Read the Full Story >>
Permeable Reactive Barrier (PRB) Installation

Permeable Reactive Barrier (PRB) Installation

Gastonia, NC

Rapid installation of a permeable reactive barrier at a Southeastern superfund site in response to an urgent groundwater issue.

Read the Full Story >>
GPR & Drilling – Subsurface Investigation

GPR & Drilling – Subsurface Investigation

Linden, NJ

Multi-technology subsurface investigation including GPR preclearance, drilling across 16 locations, and installation of injection wells.

Read the Full Story >>
Long-Term Injection & Monitoring Well Program

Long-Term Injection & Monitoring Well Program

Princeton Junction, NJ

Nine years of continuous involvement supporting environmental investigation and remediation efforts with multiple drilling technologies.

Read the Full Story >>
Sonic Drilling on Collegiate Athletic Field

Sonic Drilling on Collegiate Athletic Field

Princeton, NJ

High-resolution subsurface investigation on Princeton University's baseball field using Terra Sonic technology with zero impact to artificial turf.

Read the Full Story >>
Multi-Depth Monitoring Well Installation

Multi-Depth Monitoring Well Installation

Raleigh, NC

Installation of 10 monitoring wells to depths up to 170 feet, completed 7 days ahead of schedule with multi-crew coordination.

Read the Full Story >>
Shallow Bedrock Well Installation

Shallow Bedrock Well Installation

Roselle, NJ

Precision drilling in a space-restricted urban environment with installation of three shallow bedrock monitoring wells.

Read the Full Story >>
Engineering Cap Repair & Streambank Stabilization

Engineering Cap Repair & Streambank Stabilization

Spartanburg, SC

Restoration of 200 linear feet of storm-damaged streambank and multi-layer engineered cap system in dense woodland.

Read the Full Story >>
Deep Vertical Aquifer Profile (VAP) Investigation

Deep Vertical Aquifer Profile (VAP) Investigation

Spartanburg, SC

Deep roto-sonic drilling to 300 feet with high-resolution vertical profiling of VOCs in groundwater at 6 VAP locations.

Read the Full Story >>

Start-a-Project

Quick Response Proposal Request Form

1
2

(Please check all boxes that align with your Request for Proposal)

Geophysical Services

Drilling Services

Remediation Services