

Airport Earth Work
This active North Carolina project required a team that could work safely around a critical transportation facility. But that's not all!
Project Gallery

Bentonite Hydraulic Cut-Off Wall Installation
Charlotte, NC
Summit constructed a bentonite-based hydraulic cut-off wall within an active airport environment adjacent to a runway and taxiway.
Read the Full Story >>
Emergency Storm Sewer Repair
Brick, NJ
Summit delivered a complete investigation-to-restoration solution for an urgent subsurface infrastructure issue involving a monitoring well that punctured a storm sewer line.
Read the Full Story >>
Sonic Drilling – Overburden & Bedrock Wells
Charlestown, RI
Large-scale sonic drilling and well installation program at a U.S. Army Corps of Engineers site with 30 overburden wells and rock coring to 150 feet.
Read the Full Story >>
Methane Mitigation System with Cupolex & VIMS
Charlotte, NC
Installation of a complex methane mitigation system for a 7-story building including 15,920 sq. ft. of Cupolex domed forming system.
Read the Full Story >>
Permeable Reactive Barrier (PRB) Installation
Gastonia, NC
Rapid installation of a permeable reactive barrier at a Southeastern superfund site in response to an urgent groundwater issue.
Read the Full Story >>
GPR & Drilling – Subsurface Investigation
Linden, NJ
Multi-technology subsurface investigation including GPR preclearance, drilling across 16 locations, and installation of injection wells.
Read the Full Story >>
Long-Term Injection & Monitoring Well Program
Princeton Junction, NJ
Nine years of continuous involvement supporting environmental investigation and remediation efforts with multiple drilling technologies.
Read the Full Story >>
Sonic Drilling on Collegiate Athletic Field
Princeton, NJ
High-resolution subsurface investigation on Princeton University's baseball field using Terra Sonic technology with zero impact to artificial turf.
Read the Full Story >>
Multi-Depth Monitoring Well Installation
Raleigh, NC
Installation of 10 monitoring wells to depths up to 170 feet, completed 7 days ahead of schedule with multi-crew coordination.
Read the Full Story >>
Shallow Bedrock Well Installation
Roselle, NJ
Precision drilling in a space-restricted urban environment with installation of three shallow bedrock monitoring wells.
Read the Full Story >>
Engineering Cap Repair & Streambank Stabilization
Spartanburg, SC
Restoration of 200 linear feet of storm-damaged streambank and multi-layer engineered cap system in dense woodland.
Read the Full Story >>
Deep Vertical Aquifer Profile (VAP) Investigation
Spartanburg, SC
Deep roto-sonic drilling to 300 feet with high-resolution vertical profiling of VOCs in groundwater at 6 VAP locations.
Read the Full Story >>Start-a-Project
Quick Response Proposal Request Form
(Please check all boxes that align with your Request for Proposal)
